Income Tax Office

Case study 04 / 10 · Governance & Public Offices

Quiet decisions, five stars

Income Tax Office, Bhopal

A public Office on Arera Hills whose rating rests on practical decisions about the envelope, daylight, water, materials and planted ground.

Project
Income Tax Office
Location
Bhopal, Madhya Pradesh
Client
CPWD
Our role
Architectural and Engineering consultant for CPWD
Built-up area
14,000 m²
Site area
4 acres
Project value
₹70 crore
Rating
GRIHA 5-star
Status
Completed 2024

01

The brief

A new Office for the Income Tax Department in Bhopal, built by the Central Public Works Department, close to the existing Ayakar Bhawan so that taxpayers find it easily and officers gain a new place to work.

02

The site

A 4-acre site on Arera Hills, Bhopal, with room for planted grounds around a 14,000 m² building.

03

The idea

A dome and colonnades give the building its public face. Behind them, the envelope is designed for energy efficiency and makes good use of daylight, reducing the need for artificial lighting.

Each supporting measure is modest; together they lower the building’s environmental impact and running costs, and give the people who work here daylit rooms and planted ground outside the window.

ColonnadeDomeHigh sun held off by the colonnadeRain tank123456
Section diagram of the idea, not to scale. It explains the design principles and is not the building section.
  1. 1
    Shaded frontThe colonnade and deep overhangs hold off the high sun.
  2. 2
    Daylit roomsAn envelope designed for daylight reduces artificial lighting.
  3. 3
    Rooftop solarSolar panels provide renewable energy.
  4. 4
    WaterRainwater harvesting and low-flow fixtures save water.
  5. 5
    MaterialsChosen for low embodied energy.
  6. 6
    Planted groundsLandscaped green areas support biodiversity and reduce the heat island effect.

04

The design

4.1

A public face

A dome and colonnades give the Office a civic presence on Arera Hills.

Working with the climate
4.2

Working with the climate

The envelope is designed for energy efficiency and daylight, supported by rooftop solar, rainwater harvesting and low-flow fixtures.

Daylit rooms, planted ground
4.3

Daylit rooms, planted ground

Materials are chosen for low embodied energy, and planted grounds temper the heat around the building.

05

Outcome

ARCH-EN DESIGN was the Architectural and Engineering consultant for CPWD, appointed in 2019; the building was completed in 2024. It holds a GRIHA 5-star rating (pre-certification July 2022, provisional rating September 2025) and received GRIHA Exemplary Performance Awards in 2024 and 2025, for passive Architecture design and energy management design.

  • Appointed2019
  • Completed2024