Jhansi node site plan

No. 124 · Townships & Residences

Uttar Pradesh Defence Industrial Corridor: Node Development

Agra, Aligarh, Chitrakoot, Jhansi, Kanpur and Lucknow, Uttar Pradesh

Jhansi node site plan
Location
Agra, Aligarh, Chitrakoot, Jhansi, Kanpur and Lucknow, Uttar Pradesh
Client
Uttar Pradesh Expressways Industrial Development Authority (UPEIDA)
Status
Ongoing
Site area
3,467 acres across the Kanpur, Jhansi, Chitrakoot and Lucknow nodes
Project value
₹900 crore
Appointed
June 2022
Sector
Townships & Residences

Infrastructure and common buildings for the industrial nodes of the Uttar Pradesh Defence Industrial Corridor, laying out roads, utility networks and shared facilities so that manufacturers can move onto prepared land.

About the project

The Uttar Pradesh Defence Industrial Corridor sets aside land at several nodes across the state for defence and aerospace manufacturing. The work here is to prepare that land: to set out the roads and networks each node needs, and to design the common buildings that let industry move in.

Five nodes

  • Jhansi: 1,000 hectares (2,471 acres), in pockets for large and medium units
  • Kanpur: 203 hectares (501 acres), beside the Fatehpur branch canal
  • Chitrakoot: 100 hectares (247 acres)
  • Lucknow: 100 hectares (247 acres)
  • Aligarh

A plan for each node

Each node has its own site plan and detailed working drawings. Together they set out the road layout with street lighting, and the networks for power, water, sewerage, drainage and fire fighting that every plot will draw on.

Shared buildings

Alongside the networks are the buildings that an industrial area shares. Fire stations and police posts serve the nodes. Multi-utility buildings gather shops, canteens, banquet halls and guest rooms. Staff Housing is planned in two apartment types, and entrance gateways mark the approach.

UPEIDA appointed ARCH-EN DESIGN in June 2022 for the infrastructure services design, Architectural design and building services of the nodes.

Our role

Comprehensive infrastructure services design, Architectural design and building services, tender documents and bid support

Highlights

  • Five nodes across Uttar Pradesh
  • Road, power, water, sewerage, drainage and fire networks for each node

Milestones

  • 14 September 2021: Prime Minister Narendra Modi views the exhibition models of the corridor's Aligarh node